Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Raw material refers to a long spring steel rod. The first step is to shear the raw materials into the required length. Then put the sheared spring steel into the heating furnace. The temperature in the furnace is 950-1000ºC. After heating, the clips are formed through three stages of bending by hot molding equipment. After forming, the elastic rail clips are conveyed to a quenching oil tank. After quenching, the elastic rail clips are tempered at 400-500°C. The elastic rail clips are finally oiled and packed. The elastic rail clips must have a hardness between 40 and 48 HRC.
From the first step of raw material purchasing to the final step of finished products, we do strict inspections. We uses high precision inspection machines to make sure the finished elastic rail clips meet the requirements.
E-type Clips | |||
Model | Diameter | Material | Hardness |
E1809 | ø20 | 60Si2MnA | 44-48 |
E1813 | ø18 | 60Si2MnA | 44-48 |
E2001 | ø20 | 60Si2MnA | 44-48 |
E2039 | ø20 | 60Si2MnA | 60Si2MnA |
E2055 | ø20 | 60Si2MnA | 60Si2MnA |
SKL Tension clips | |||
Model | Diameter | Material | Hardness |
SKL1 | ø13 | 60Si3CrA | 42-47 |
SKL3 | ø13 | 60Si3CrA | 42-47 |
SKL12 | ø13 | 38Si7 | 42-47 |
SKL14 | ø14 | 60Si2MnA | 42-47 |
Other Rail Clips | |||||
Model | Russia rail clip | Deenik clip | Anti-vandal clip | Fast clip GL1419 | GL1419 |
Diameter | ø18 | ø25 | ø18 | ø15 | ø14 |
For non-listed rail clips, please contact our sales for details.